    You watched as the rework of our facility began in 1997,  and the work continues into '98.  The grounds near the starting area were raised for better viewing by the spectators.    A tunnel was added in front of the grand stands, allowing  for safe access across the track.   Our brand new two-story concession stand is nearing completion.   This new building will have a complete kitchen, restrooms, including showers and changing areas, as well as offices.  All of these changes, along with the newly paved, two-lane road, makes Lake Sugar tree one of the most complete racing facilities in the region.

Great for the crowd with complete concessions and rest areas.

Challenging for the racers.

foundation pipess.jpg (27998 bytes)

The foundation had been poured and now the plumbing for the first and second floors was being installed.

walls starts.jpg (28275 bytes) The concrete block walls are started.
ext walls onlys.jpg (27402 bytes) The exterior walls are up along with some of the door and window hardware.
deck looking to tracks.jpg (23619 bytes) The deck outside the concession windows has been poured.   In this picture the track is down to the right.
decks.jpg (24917 bytes) The walkway has been poured around the entire building.   The second story floor is installed with a walkway and large presentation area overlooking the track.
bath plumbings.jpg (27662 bytes) Inside the plumbing work continues on the two large restrooms with showers and changing areas.
mems head1s.jpg (22778 bytes) The restroom counters, sinks and automatic fixtures are being installed.
womens stallss.jpg (21842 bytes) On the other side of the building work continues in the women's restroom.
2nd story roofs.jpg (24150 bytes) The second story roof is framed and dry-walling begins on the second floor office area.
ext walls1s.jpg (23970 bytes) Back outside you can now see how it is all coming together.   Construction of the roof continues as the workers prepare to install the metal sheets.
ext with roofs.jpg (27052 bytes) As the roof gets close to being finished, the painters start on the exterior walls.
ext side dones.jpg (26560 bytes) With the roof finished, painting continues and stairs are installed on both sides of the presentation area.
paint and windowss.jpg (24177 bytes) From the back side of the building, you can see just how close we are to being finished.

Thanks for watching us grow...  Now join us for the fun.



A Brand New Two-Lane Road Going Around The Race Track

A Wider, Newly Paved Entrance making it easier to to get those trailers and Motorhomes in and out.

This is looking from the entrance at State Route 617 towards the track.